Sizing
Buildings change. Lighting, glazing, occupancy and plug load today are rarely what they were when the original unit was picked. We verify the load rather than copying the nameplate, because an oversized unit short cycles and costs more to run.
02
Disruption planning
The work window is set around your operating hours. Most office replacements are staged over a weekend with temporary cooling where the space cannot go without it.
03
Handover
You receive commissioning readings, warranty registration, the equipment list update and the maintenance schedule for the new unit in a single document.